39th APS loading MAFFS unit
Members of the 39th Aerial Port Squadron physically push the MAFFS unit on to a C-130. It takes about two hours to load and configure the unit onto a C-130 aircraft. (U.S. Air Force photo/Master Sgt. Daniel Butterfield)
PHOTO BY:
VIRIN:
150513-F-MF976-001.JPG
FULL SIZE:
1.94 MB
CAMERA
N/A
LENS
N/A
APERTURE
N/A
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.